Whapmagoostui Kuujjuaraapik Hybrid Power Plant Project

Step in the procedure

Information on the projet

Promoter

Kuujjuaraapik Whapmagoostui Renewable Energy Coorporation (KWREC)

Reference number

3219-10-001

Subscribe to the email alerts for this project

Need more d’information ?

Contact us by email at [email protected]

Project summary

KWERC plans to build a Hybrid Power Plant with an installed capacity of 3.0 MW of wind power. The Hybrid Power Plant Project is located at the southwestern end of Nunavik, on the edge of the Hudson Bay and near the mouth of the Great Whale River, on the outskirt of villages in the Whapmagoostui and Kuujjuaraapik communities. The project requires the installation of two wind turbines with a nominal capacity of 1.5 MW each. These wind turbines will be connected by a 25 kV interconnection line to a substation (to be built). A 4 kV interconnection line will link this substation to the existing power plant operated by Hydro-Québec Distribution. An access road will also be built. The objective of the project is to reduce the use of fossil fuels and GHG emissions in the region.

For more information on this project, please visit: http://kwrec.ca/

 

Details on location

The project is located in the Nord-du-Québec administrative region, on the territory of Eeyou Istchee James Bay, on Category IA lands, on the outskirt of villages in the Whapmagoostui and Kuujjuaraapik communities.



Disclaimer

Une partie des informations de ce site Internet pourrait avoir été fournie par des sources externes. Le COMEX n'assume aucune responsabilité concernant la précision, l'actualité ou la fiabilité des informations fournies par les sources externes. Les utilisateurs qui désirent employer cette information devraient consulter directement la source des informations.