Project summary
Wallbridge Mining Limited wishes to operate an underground mine from an existing ramp in a pit that was dewatered in 2018. The Fenelon gold project aims to extract gold ore at a rate of 235 tons per day on average and 450 tm / d at most from existing infrastructures, which will be processed outside the site, in a plant located in Abitibi-Témiscamingue or in Nord-du-Québec.
For more information on this project, please visit : https://wallbridgemining.com/our-projects/fenelon-gold/
Details on location
The Fénelon project is located in the extreme southern limit of the administrative region of Nord-du-Québec which begins at the 50th parallel in this sector and the mining site is located in an isolated environment. The closest community to the project is Matagami, located 70 km easterly as the crow flies. The property is on category III land.
Documents
Preliminary information
Environmental and social impact assessment
- 2020-10-19 Wallbridge Mining Limited, Impact study -1 of 3, october 2020, 1849 pages.
- 2020-10-19 Wallbridge Mining Limited, Impact study -2 of 3, october 2020, 1635 pages.
- 2020-10-19 Wallbridge Mining Limited, Impact study -3 of 3, october 2020, 305 pages.
- 2020-10-16 Wallbridge Mining Limited, Additionnal information to the impact study, october 2020, 319 pages.
- 2020-12-17 Wallbridge Mining Limited, Suspension of the analysis, December 2020, 2 pages (french only)
Summary
Documents produced by COMEX
- 2020-08-27 COMEX Impact study analysis, august 2020, 1 page (french only).
- 2021-01-29 COMEX Suspension of the analysis by the proponent, January 2021, 1 page (french only)
Documents produced by MELCC
Table provided by MELCC
Disclaimer
Some of the information on this website may have been supplied by external sources. The Review Committee assumes no responsibility for the accuracy, timeliness or reliability of information supplied by external sources. Users wishing to rely on this information should consult directly with the appropriate source.
Suspension of the analysis by the proponent