Connecting the Rose lithium-tantalum mine and relocating a segment of the 315-kV line
Step in the procedure
Information on the projet
Promoter
Hydro-Québec
Reference number
3214-09-028
Subscribe to the email alerts for this project
You need further information?
Contact us by email at [email protected]
Project summary
For the Rose lithium-tantalum mine project to go forward, Hydro-Québec will need to relocale a 4.1 km segment of the Eastmain-1-Nemiscau line, which currently cuts through the future open-pit site. The relocated line segment will bypass the pit to the east, keeping a minimal distance of 500 metres from the boundaries of the planned mining site. For electricity supply, Hydro-Québec plans to connect the mine to the 315-kV Eastmain-a-Nemiscau line. A 315/25-kV transformer substation will be construct, west of the connection point. No new structure will be required for this connection.
Details on location
The project is located in the Nord-du-Québec administrative region, on the territory of Eeyou Istchee Baie-James, on Category III lands, 40 kilometers north of the Cree village of Nemaska.
Documents
Environmental and social impact assessment
- 2018-05-24 Hydro-Québec, Impact study, may 2018, 164 pages.
- 2018-05-24 Hydro-Québec, Map - Biophysical and human environments, may 2018, 1 page.
- 2018-05-24 Hydro-Québec, Appendices A to G, may 2018, 157 pages.
- 2019-05-16 Hydro-Québec, Supplement to the environmental impact study, may 2019, 48 pages.
Documents produced by COMEX
- 2018-09-27 COMEX Connecting the Rose lithium-tantalum mine - Questions and comments, september 2018, 21 pages (french only).
- 2022-11-30 COMEX Connecting the Rose lithium-tantalum mine - Recommendation, November 2020, 23 pages (french only).
Documents produced by the MELCC
- 2017-11-01 MDDELCC Connecting the Rose lithium-tantalum mine Directive, november 2017, 14 pages (french only).
Table provided by MELCC
Disclaimer
Some of the information on this website may have been supplied by external sources. The Review Committee assumes no responsibility for the accuracy, timeliness or reliability of information supplied by external sources. Users wishing to rely on this information should consult directly with the appropriate source.